Hey!
My name is Bartek.
My nickname in the world of modding it SKEEPER.
For several years we have been creating reservoirs.
These are fully customs versions whose life begins on a piece of paper.
One day I was invited to evet I could present their reservoirs, but because they were made individual order, it did not have excessive of the show.
O fate, I even do not have a computer
. (Just an old laptop).
Many months, lost in my studio I did not expect that one day you will have to go to the people with what robe.
.... So it's time I made my projects, full two platform, which will be my business card.
Platform will be based on the basis of housings:
Phobya WaCoolT Benchtable black - Aluminium Edition
and
be quiet! DARK BASE PRO 900.
What will each see soon.
I guarantee you a substantial dose of photos from the construction of the reservoir, computer parts and work on projects.
Here we go!
I hope that you will not be bored by looking here.
I want to say that the implementation of my projects would not be possible without the support of many companies.
I will not unnecessarily extended the theme and pasting their logos.
According to me much more interesting presentation of them will be showing the parts in the form of images.
My work and parts used for the projects contain a lot of pictures. If someone will bothered by this, then please tell me. - Thank you.
... Let art defends itself.
As the first on the worktable went Phobya - WaCoolT Benchtable black - Aluminium Edition.
Here she is.
Note - my worklog based on a fairly large number of images. If a large number of images will be troublesome, please tell me about it.
Let's continue.
The first alteration was to rework the original flow rates of liquids that look like this:
The factory is arranged on a hose having an inner diameter of 10mm or less.
Processing consisted of get cut off ends
... And making endings of the internal G1 / 4 ".
Now you can arm them with standard connectors.
Interesting fact - terminals is rotating. In the case of tubes is not a problem, but hoses for positioning said flow rate is difficult. Rotating tip to help.
An additional option is to screw this indicator to the desired location - the rate fixed rigidly keep snakes in check (will not be hanging off
)
For assembly is the part that just created:
With pieces of acetal we form cubes
... To beautify round longer edges
...effect.
Shorter firmly cut.
Effect.
Drill 3 holes.
Tap.
Continuation.
Finished parts.
As we have parts made, this time to unite them with the indicators, and the whole thing looks like this:
My name is Bartek.
My nickname in the world of modding it SKEEPER.
For several years we have been creating reservoirs.
These are fully customs versions whose life begins on a piece of paper.
One day I was invited to evet I could present their reservoirs, but because they were made individual order, it did not have excessive of the show.
O fate, I even do not have a computer

Many months, lost in my studio I did not expect that one day you will have to go to the people with what robe.
.... So it's time I made my projects, full two platform, which will be my business card.
Platform will be based on the basis of housings:
Phobya WaCoolT Benchtable black - Aluminium Edition
and
be quiet! DARK BASE PRO 900.
What will each see soon.
I guarantee you a substantial dose of photos from the construction of the reservoir, computer parts and work on projects.
Here we go!
I hope that you will not be bored by looking here.
I want to say that the implementation of my projects would not be possible without the support of many companies.
I will not unnecessarily extended the theme and pasting their logos.
According to me much more interesting presentation of them will be showing the parts in the form of images.
My work and parts used for the projects contain a lot of pictures. If someone will bothered by this, then please tell me. - Thank you.
... Let art defends itself.
As the first on the worktable went Phobya - WaCoolT Benchtable black - Aluminium Edition.
Here she is.






Note - my worklog based on a fairly large number of images. If a large number of images will be troublesome, please tell me about it.
Let's continue.
The first alteration was to rework the original flow rates of liquids that look like this:


The factory is arranged on a hose having an inner diameter of 10mm or less.
Processing consisted of get cut off ends


... And making endings of the internal G1 / 4 ".
Now you can arm them with standard connectors.



Interesting fact - terminals is rotating. In the case of tubes is not a problem, but hoses for positioning said flow rate is difficult. Rotating tip to help.
An additional option is to screw this indicator to the desired location - the rate fixed rigidly keep snakes in check (will not be hanging off

For assembly is the part that just created:
With pieces of acetal we form cubes

... To beautify round longer edges

...effect.

Shorter firmly cut.

Effect.

Drill 3 holes.

Tap.

Continuation.
Finished parts.




As we have parts made, this time to unite them with the indicators, and the whole thing looks like this:






Last edited: