Wraith
Bettyswollocks
Nice job for your first attempt, you have the initial experience and feel for it now, take your time and it'll pay off.first bend!
Nice job for your first attempt, you have the initial experience and feel for it now, take your time and it'll pay off.first bend!
Nice job for your first attempt, you have the initial experience and feel for it now, take your time and it'll pay off.
Nice job for your first attempt, you have the initial experience and feel for it now, take your time and it'll pay off.
yeah don't got full shia labeouf on it, take your times and then it will work out over time.
Looks good for a first bend! A bit tricky at first, isn't itFor me the very first bend was the scariest one, not knowing very well how the tube would act and such.
How much does it move? A little trick is to make a clean cut near the end of the tube and insert it in a fitting. Then take some masking tape and tape where the tube comes out of the fitting. Measure that so you know how many mm is needed extra on both ends that go in the fittings. If I'm correct it was around 8mm.
If you take these extra 16mm into account, the tube will be nice and snug without the fittings beings screwed down. Not a very big deal if it moves just a tiny bit though, the o ring should seal it off anyway.
Something I had to do in order to install that tube, was removing my gpus. I then put the first end of that tube on my gpu block, then inserted my cards back in while getting the tube in the top rad. Would have never worked otherwise because I added the 8mm on both ends to have an extra snug fit.
first bend!
Bend looks good but please don't tell me you've put a radiator "between the blocks to lower temps"
In Orca my CPU block is technically running in reverse (I did it just so the logo was the right way up)
I wouldnt flap about tiny details mate - make it look the tidiest you possibly can do. As long as you go res - pump the order after that should just be tidy IMHO.
The whole rad between blocks thing just makes look untidy most of the time
Maybeee.. Another option is to put your blocks in a parallel config and work a loop out between the rads?
The whole rad between blocks thing just makes look untidy most of the time
Everything is untidy if you do it like a total noob.
JR
i am a noob at hardlining
also the tubing is extremely hard to get now for some reason..
are you referring to using the ek sli fittings?
newb ≠ noob
You sure there is LOTS out there last time I checked
http://www.watercoolinguk.co.uk/p/PrimoChill-Acrylic-Tube-1310mm-60cm-24inch-4-Pack-Clear_45081.html
JR
No, I think it must be possible to go gpu top left port to cpu and then back to the gpu too right port and make a parallel loop like that to reduce the amount of very long runs. However if they're not alligned nicely it may look a bit off
watercooling uk what £10 just to deliver the tube, my ocd will not let me mix tubing manufacturers, i'm best off waiting for OCUK to get more in.