Prometeia Mach II GT X 3 The SUB ZERO Project

Rock and roll baby!



Finally, now I just have to get some Dremel attachments to clean them up.

IM003136.jpg


IM003140.jpg


IM003147.jpg
 
Very sideways - I like. I'll let you have the "in a case" and "single stage" records - I'm moving over to double dual stage and giving up my case. Still want to see some big numbers though. (Or small ones in the case of superpi/pifast).
 
name='GoLLuM4444' said:
Very sideways - I like. I'll let you have the "in a case" and "single stage" records - I'm moving over to double dual stage and giving up my case. Still want to see some big numbers though. (Or small ones in the case of superpi/pifast).

Managed to get the Dremel stuff to buff. 8)



I also indulged in the Multi Saw, man it can get costly using cutting pads, they don't sell them for cheap!. :roll:

IM003168.jpg


As promised a peak at my new workshop (future home of the SUB ZERO), needs a paint job etc... I need the ceiling height just incase I decide to ad 6 more Prommies for a triple cascade X3. :shock:

IM003150.jpg


IM003151.jpg


IM003154.jpg
 
thats one hell of a benchin rig u built ther d00d.......how long did that take u and what kind of scores are u expectin from it????
 
name='PiNhEaD' said:
thats one hell of a benchin rig u built ther d00d.......how long did that take u and what kind of scores are u expectin from it????

It's taken a while because of money really, but now it's taking time do to the sheer amount of stuff going into the unit.

Above average scores.

Does anyone know the exact length of the capillary tube and the exact amount of R404 required for the Mach II GT?
 
Hi!

Been a while since I posted but I'm sure you'll understand why.

We had a really tuff time getting phone service and ADSL as Bell is on strike so we axed them and went with Sprint/Rogers. Just got a 6 Mb business addition service in the shop today and I can now remote to the server on Magma (100 Mb). Between renovations, jobs and everything else I haven't had a chance to do much with SUB ZERO. We're still sanding and painting etc... but I felt I should hook-up and post.

renovation20.jpg


renovation21.jpg


The modified Prommie heads!

prommie_mod2.jpg


prommie_mod4.jpg


More!
 
you shoudl see if any one would be interested in buyong more of them head ready made by you, now you have done all the hard work i.e. finding how to make em fit, you could probs sell em to peeps who with to phase chnage thier grpahic card using an existing mach 2

phil
 
name='GoLLuM4444' said:
Those heads look great. Just like the originals but more sideways and colourful. A very professional job.

Yeah, I think they look great too!

Just wanted something different than the standard black. :)
 
PHILIP1193 said:
you shoudl see if any one would be interested in buyong more of them head ready made by you, now you have done all the hard work i.e. finding how to make em fit, you could probs sell em to peeps who with to phase chnage thier grpahic card using an existing mach 2

phil

I have the specs on paper with everyone that moded the heads for me, I will see how they perform soon.

The idea is there for everyone to copy, it's a free for all! :)
 
After a long couple of days getting my office fixed-up and the workshop cleaned I decided to post a few extra pics. I did receive the stainless steel flex lines yesterday and I'll be getting the fridge guy's in soon to finish up. :)

soon.jpg


More! :)
 
you must have money to burn as well as aburning desire to have some extreme clocks :p

Man you rock, all this tuff is amazing

Good luck

whats yr eta till completion of it roughly

Phil
 
PHILIP1193 said:
you must have money to burn as well as aburning desire to have some extreme clocks :p

Man you rock, all this tuff is amazing

Good luck

whats yr eta till completion of it roughly

Phil

No, actually I don't have lots of money, I pay as I go and no credit.

I'm as broke as most, seriously!

I need to get my shop up and running first, I will spend time on it when I can. There's a lot going in this baby, it will take time! My best estimate is 1st week of december. :)
 
name='Whizzz' said:
There's a lot going in this baby, it will take time! My best estimate is 1st week of december. :)

Quality > speed, im sure this thing will be awesome when it is finished (it is pretty cool already :D)

G
 
Back
Top