i just read this rule of thumb:
1 120 per component plus 1 for good themps
but since im planing on getting a 2nd 7970 it will be 3 components
do you think it will be fine anyway?
the new shopping cart https://www.aquatuning.ch/shopping_cart.php/bkey/2870ae9c24cc52481254bf777690117b
could somebody add the missing parts like howses compression fittings, coolant (blue), a tube res and whatever else is necesary to complete the loop?
i dont really know wich parts i forgot and gow many and how much of what i need
by the way how should my loop look like
i was playing around whit a bunch of ideas but i think ill just ask the pros
i mean like from the rad to the cpu block to the gpu block to the res to the punp tho the rad or something
by the way how should my loop look like
i was playing around whit a bunch of ideas but i think ill just ask the pros
i mean like from the rad to the cpu block to the gpu block to the res to the punp tho the rad or something
as long as the pump follows the reservoir, you should be okay. after that, make your tubing take the shortest route possible to the next block/rad. do it in a way so that you minimize tubes crossing, or never if possible.