AMD 65nm Next Month :)

maverik-sg1

New member
The Inq Reports:

BEING MORE than a tad evasive on the subject, AMD looks set to ship its first 65 nm products next month (October 2006). The company's more fixated about migrating an existing Fab from 200 mm to 300 mm wafers.

According to Toralf Gueldner, director of production at AMD's Dresden fabs, the company has been able to produce 65 nm products since June. This has been followed by 'full flow' this month [September 2006] and will be followed by serious 65 nm shipments in October.

Even more intriguing is the fact that Gueldner expects AMD to be "fully converted" over to 65 nm by mid-2007. He didn't elaborate, however.

Gueldner also revealed that AMD had already created its first 45 nm test chips. In the distant future they will be followed by 32 nm and 22 nm products.

What AMD really wanted to talk about is the gradual conversion of its existing Fab 30 over to 300 mm wafers from 200 mm. AMD will then rename the Fab from 30 to Fab 38. It should then start producing its first 20K 300 mm wafers from Fab 38 in Q1 2008.

The reason why AMD can afford to phase Fab 30 out is thanks to the existence of Fab 36 producing 90 nm SOI (Silicon-On-Insulator) already.

fab36.jpg
The company has made a number of improvements to yields from its silicon. One reason being that the company supplying its masks now has a factory down the road in Germany. The wafers are still sent to Singapore to be cut and packaged, however.

Another good reason for increased yields is its adoption of Front Opening Shipping Boxes (FOSBs). These keep the wafers almost hermetically sealed for the vast majority of the production process – only exposing them to its cleanroom standard of 100 particles per cubic metre of air on very rare occasions.

AMD claims that in the list of fabs operated by all the members of the Sematech alliance, Dresden comes absolutely top. It wouldn't say where Intel came on the chart.

The final major achievement AMD is proud of is that Dresden has proved to be a major employer of former citizens of East Germany. µ See Also

AMD 65 nm chips are on track.
 
2 months ahead of schedule aint bad... which means the Quad-Core chips wont be too far behind.

I reckon Intels lead will be cut (CUT...not LOST) due to the IMC on a Quad Vs Quad test. AMD realllllyyy need to get K8L hyped a bit... drawback is... the full K8L testing cant begin until proper K8L mobos are ready.
 
Interesting, i doubt this means that quads will be ahead of schedule, they havent dropped the power yet, and that probably still wont happen until next year.

Interesting stuff on this in this article.

G
 
Surely AMD should have had all of this ready to compete with the Conroe, or the next quad cores from Intel?
 
After the Energy Efficient version of AMD chips, as long as they keep the speeds low, they could have technically release Quad-Core on 90nm.. if there was space on the die.

65nm should be fine for it. :)
 
name='stocky' said:
Surely AMD should have had all of this ready to compete with the Conroe, or the next quad cores from Intel?

Sony should have had the PS3 out for this Xmas, Vista should have been released by MS this summer, Intel should have developed the P3 structure rather than making Prescott.

These things happen.

G
 
Back
Top