Hi all i have been asked to build a rip for the company i work for to run a mimaki cjv30 and a oce colourwave 600 with a small buget i sugested the following:
intel i5 2500
GA-H67M-D2 Intel H67 (REV B3)
4gb of corsair xms3 1333
a coolermaster psu 500w
cheap dvd drive
BitFenix Outlaw Black Midi Tower Chassis
win 7 pro 32bit (as the rip is a 32bit program and i have tryed 64bit and it rips slower)
the grand total was just over 500 pounds i told them i would make it for free and fix it also for 2 years. The md told me i was riping him off and and i had no idea little dose he know i have made 3 simeler ones for the company i used to work for and not had one back or one problem and i have a i7 gamind rig i build myself also oced when i tryed to explain this he said he did not care. any way he went away and asked a few other ppl to quote for a simalar system and the cost was just over 1200. now my question is should i make it if he comes crawling back or tell him to get lost i am not intrested.
ps the deadline now wed to build and test in my own time also.
intel i5 2500
GA-H67M-D2 Intel H67 (REV B3)
4gb of corsair xms3 1333
a coolermaster psu 500w
cheap dvd drive
BitFenix Outlaw Black Midi Tower Chassis
win 7 pro 32bit (as the rip is a 32bit program and i have tryed 64bit and it rips slower)
the grand total was just over 500 pounds i told them i would make it for free and fix it also for 2 years. The md told me i was riping him off and and i had no idea little dose he know i have made 3 simeler ones for the company i used to work for and not had one back or one problem and i have a i7 gamind rig i build myself also oced when i tryed to explain this he said he did not care. any way he went away and asked a few other ppl to quote for a simalar system and the cost was just over 1200. now my question is should i make it if he comes crawling back or tell him to get lost i am not intrested.
ps the deadline now wed to build and test in my own time also.